Project Cost: $29,900
The original roof was falling apart and had not been repaired or changed since 1996. Through the generosity of Bob Fanch ’69 and alumni donations the project was finally able to be planned and executed. The project was managed by the ZNLA Physical Plant Manager Bryan Shephard ’07.
Work performed by Pinnacle Roofing Inc. out of Schenectady, NY.